S O U T H W E S T  W A S H I N G T O N   C H A P T E R

I n t e r  n a t i o n a l  C o d e  C o u n c i l

S W W - I C C . O R G

                                            TECHNICAL ADVISORIES   

 

Home

Members

Calendar of Events

Join SWW-ICC

Leadership

Details

Jurisdictions & Contactstacts

Useful Links

Contact Us

 











 

 

                       tr>
2015 IRC DETAILS
R105-1 Detached Accessory Structures PDF
R105-2 Detached Accessory Structures PDF
R301.1-1 Second Floor to First Load Path PDF
R301.1-2 Load Path at Open Web 2x Floor Trusses PDF
R302.2-2 Walls-townhouse Two-One Hour-parallel PDF
R302.2-3 Walls-townhouse Two-One Hour Two Story-Perpendicular PDF
R302.2-10 Townhouse Separation Continuity PDF
R302.3-1 Trusses and joist perpendicular to one hour duplex wall PDF
R304-1 Minimum Dwelling Unit PDF
R311.7.81 Residential Handrails PDF
R311.8-1 Residential Ramp PDF
R311.8-2 Residential Ramp PDF
R324.3 Solar Panels access/ventilation/td> PDF
R402.1.1-1 Below Grade Insulation for Basements PDF
R403.1.3-1 Typical Foundation PDF
R403.1.3-2 Slab on Grade PDF
R404-D Joists Perpendicular to Wall - Residential Basement Wall PDF
R404-E Joists Paraellel to Wall - Residential Basement Wall PDF
R502.6 Bearing at Stem Wall PDF
R507-1 Residential Decks PDF
R601.2-4 Attic Truss Load Path Continuity PDF
R601.2-5 Load Path Continuity PDF
R601.2-6 Diaphram Continuity PDF
R601.2-7 Diaphram Continuity PDF
R601.2-8 Roof Framing Details PDF
R601.2-9 Load Path Continuity PDF
R601.2-10 Brace Wall Panel Connection PDF
R601.2-12 Cantilever Brace Wall Connection PDF
R601.2-13 Load Path Continuity PDF
R601.2-14 Prescriptive Gable End Bracing PDF
R602.10.6-12 Alternate Brace Wall Paneling PDF
R602.10.6.2-3 Braced Wall Panel Methods PDF
IFC605.11.1.2-1 Solar Panels Access/ventilation PDF
R703.7-1 Veneer at Post PDF
R703.12 Adhered Masonary Veneer PDF